Nakazawa Daiichi Building
It's a three-story wooden office building.
The project required an extremely tight schedule of just over six months from the start of design to completion. We worked with the construction company to find a balance between cost and time, and proposed constructing the office using wood. The proposal for wood construction was readily accepted, partly because a day care service would be located on the first floor. We adopted the SE construction method, a systematized wooden frame construction method, to create a wide, column-free space with a span of approximately 8.6m, which is impossible with conventional wooden construction. The beams used were an astonishing 600mm deep. In order to avoid structural compliance checks, which would significantly impact the construction period, we kept the floor height low, and furthermore, as a result of adopting a double floor system for the office, these large beams inevitably appeared below the ceiling. We took advantage of this shape and actively incorporated it as a design element into the office space, which can often be bland and uninteresting.
The sight of the wooden frame at the time of the roof-raising ceremony was truly impressive, and it seems that the clients were left with a very strong impression of it.
DATA:
Location: Fujisawa City, Kanagawa Prefecture
Main use: Office + elderly day care center
Scale and structure: Wooden (SE construction method), 3 stories above ground.
![]() | ![]() |
|---|---|
![]() | ![]() |
![]() |